McDonough-Whitlow, P.C. was the subconsultant for the mechanical and plumbing design for the renovation of domestic water and design of heating and chilled water systems. Design services included replacement of the following: below slab domestic water piping, existing non-functional water heaters, existing heating boilers, heating water piping and pumps and fan coil units. Design installation of a chilled water system including split bundle chiller, chilled water piping, and connection to new fan coil units was also provided. Mechanical and plumbing budget was approximately $1,038,000 with a total project cost of $7.6 million.